Pièce
9.2.2 Profil en long RN147_V3.pdf · 728 mots · du marché « Construction du viaduc du Goberté sur la RN 147 - Déviation de Lussac-les-Châteaux et Mazerolles », dossier de consultation officiel.
23+600
Terrain
8.76m
ATTENTION :
-2.5% -2.5% 2110 103 120.37 118.94
2111 120.34 118.88
Dévers droit
Axe : RN147
Projet Linéaire
PR Exploitation
Dévers gauche
Echelle Z : 1/50
9.08m
Pentes et rampes
Echelle X : 1/500
Alignts. et courbes
Distances partielles
Plan Comp : 95.00
Distances cumulées
Numéro de tabulation
113.62
sens inversé + 1m = 1.1180385195
19.44
Remblai 2
8.80m
-2.5% -2.5% 2130 104 119.37 116.16 8.55m
PI des Logis
20.00
-2.5% -2.5% 2150 105 118.37 113.39 5.89m
POITIERS
3.97m
20.00
-2.5% -2.5% 2170 106 117.37 110.53 2.12m
20.00
RN147
-2.5% -2.5% 2190 107 116.37 107.61 0.49m
Planche 4
5.77
P = 5.0%
-2.5% -2.5% 2196 107a 116.08 107.00
10.45
-2.5% -2.5% 2206 107b 115.57 106.77
3.78
-2.5% -2.5% 2210 108 115.39 106.83 0.41m
23+500
20.00
-2.5% -2.5% 2230 109 114.48 108.59 -0.82m
10.00
-2.5% -2.5% 2240 109a 114.06 110.09
10.00
-2.5% -2.5% 2250 110 113.65 111.53 -2.01m
20.00
-2.5% -2.5% 2270 111 112.90 112.40 -2.52m
20.00
-2.5% -2.5% 2290 112 112.22 111.81 -3.93m
20.00
L = 209.78m
R = 5250.00m
-2.5% -2.5% 2310 113 111.61 112.43 -5.05m
-5.18m
20.00
-5.32m
-2.5% -2.5% 2330 114 111.09 113.10 -5.28m
23+400
Déblais 3
L = 438.97m
R = 3000.00m
-5.05m
20.00
-2.5% -2.5% 2350 115 110.64 113.16 -4.72m
20.00
-2.5% -2.5% 2370 116 110.27 114.19 -3.47m
20.00
-2.5% -2.5% 2390 117 109.97 115.01 -2.47m
5.00
-2.5% -2.5% 2395 117a 109.91 115.09
10.45
-1.60m
-2.5% -2.5% 2405 117b 109.79 115.11
4.55
-2.5% -2.5% 2410 118 109.75 115.02 -1.27m
L = 331.30m
-1.01m
10.00
-2.5% -2.5% 2420 118a 109.65 114.70
DCE13
10.00
-2.5% -2.5% 2430 119 109.55 114.27 1.60m
20.00
23+300
-2.5% -2.5% 2450 120 109.35 112.82 4.41m
DCE12
4.51m
20.00
8.31m
-2.5% -2.5% 2470 121 109.15 111.62
13.44
-2.5% -2.5% 2483 121a 109.01 110.61
6.56
-2.5% -2.5% 2490 122 108.95 110.21 11.30m
5.00
-2.5% -2.5% 2495 122a 108.90 109.91
15.00
-2.5% -2.5% 2510 123 108.75 107.15 16.41m
20.00
-2.5% -2.5% 2530 124 108.55 104.14 20.06m
3.44
-2.5% -2.5% 2533 124a 108.51 104.00
16.10
-2.5% -2.5% 2550 124b 108.35 100.05 19.71m
2550 108.35 99.97
23+200
20.00
-2.5% -2.5% 2570 126 108.15 96.85 17.48m
20.00
-2.5% -2.5% 2590 127 107.95 91.54 9.18m
20.00
Viaduc du Goberté
-2.5% -2.5% 2610 128 107.75 87.68 6.33m
87.78
20.00
5.59m
-2.5% -2.5% 2630 129 107.55 87.84 4.91m
4.30m
20.00
3.81m
-2.5% -2.5% 2650 130 107.35 89.86 3.68m
3.36m
20.00
23+100
-2.5% -2.5% 2670 131 107.15 97.97 2.91m
2.76m
20.00
-2.5% -2.5% 2690 132 106.95 100.61 2.20m
13.44
-2.5% -2.5% 2703 132a 106.81 101.23
101.25
23+000
6.56
-2.5% -2.5% 2710 133 106.75 101.84 1.41m
8.00
-2.5% -2.5% 2718 133a 106.67 102.37
0.88m
9.44
-2.5% -2.5% 2727 133b 106.57 102.76
2.56
-2.5% -2.5% 2730 134 106.55 102.87 0.48m
6.73
P = 1.0%
DCE12
-2.5% -2.5% 2737 134a 106.48 103.12
0.00m
13.27
-2.5% -2.5% 2750 135 106.36 103.44 -0.49m
3.44
-2.5% -2.5% 2753 135a 106.33 103.57
-0.77m Point
Bas
DCE13
16.56
-1.45m
L = 434.26m
-2.5% -2.5% 2770 136 106.20 104.00
23+000
20.00
-2.5% -2.5% 2790 137 106.09 104.68 -2.42m
-2.63m
12.00
-2.5% -2.5% 2802 137a 106.04 105.16
8.00
-2.5% -2.5% 2810 138 106.02 105.54 -3.18m
10.00
-2.5% -2.5% 2820 138a 105.99 105.99
10.00
-2.5% -2.5% 2830 139 105.98 106.47 -3.41m
6.72
L = 192.66m
-2.5% -2.5% 2837 139a 105.98 106.75
R = 10000.00m
13.28
-3.46m
-3.47m
-2.5% -2.5% 2850 140 105.99 107.44
20.00
-2.5% -2.5% 2870 141 106.03 108.45 -3.39m
5.00
-2.5% -2.5% 2875 141a 106.05 108.68
15.00
-2.5% -2.5% 2890 142 106.12 109.30 22+900 -3.15m
20.00
-3.09m
-2.5% -2.5% 2910 143 106.25 109.66 -3.05m
15.00
-2.5% -2.5% 2925 143a 106.37 109.83
4.39
113.44
-2.5% -2.5% 2929 143b 106.41 109.88 -2.95m
2930 106.41 109.89
-2.90m
L = 497.05m
20.00
-2.5% -2.5% 2950 145 106.60 109.99 -2.72m
PS de la RD 727
20.00
-2.5% -2.5% 2970 146 106.79 109.94 -2.52m
LIMOGES
13.79
-2.5% -2.5% 2984 146a 106.91 110.00
6.21
-2.5% -2.5% 2990 147 106.97 110.02 -2.48m
B
C
A
Indice
Date
09/09/2025
01/08/2025
28/03/2025
ING
Echelles (s) :
Emetteur
Mission
DCE12
Thème
TRA
Edition du document
Sommaire des modifications
PL
Type
DCE
9.2.1 Profil en long RN147
Mise à jour à la suite des QR avec les soumissionnaires
Mise à jour à la suite des QR avec les soumissionnaires
Ouvrage
N147
9.2 RN147 aux abords du viaduc de Goberté
ABD
ABD
ABD
Numéro
Rédaction
12922
V3 du 11/09/2025
JNK
JNK
JNK
C
Indice
EBD
EBD
EBD
Vérification Approbation
Texte extrait tel quel de la pièce officielle, qui seule fait foi. La mise en page du document d'origine peut différer.